In December 2019 Dordtech has finalized and delivered a project for a containerized 1MWe biogas CHP system in Tel Yosef. This is one of the first large capacity biogas CHP installations for biogas in Israel.
This 1 MWe CHP is supplied with a new efficient power engine from Siemens to create an attractive and robust solution for the client with the most op to date technology. With this installation the customer is well prepared for the next decade.
For this project Dordtech had pre-assembled the complete containerized CHP in Dordrecht (The Netherlands) and shipped the container to Israel for its final destination. After assembling the items at location, the final commissioning by Dordtech engineer had taken place.
In addition Dordtech has designed, supplied and commissioned, a biogas pre-treatment system including emergency flare.
Project location
Tel Yosef
Project type
Biogas installatie