This 1,0 MWe Biogas Combine Heat and Power (CHP) installation, inclusive dump cooling and ventilation of the engine room, has been engineered, supplied and installed in close cooperation with Biogas Plus Systems B.V.
The CHP is placed in an noise absorbing cabin within an existing hall. The disconnection of heat and the control cabinet have been developed and installed by Dordtech. On the location a gas processing station will be developed, to further upgrade the biogas to natural gas quality, A project we are really proud of !
Project location
Woudenberg, NL (2018)
Project type
Biogas powerplant
Infomation
1,0 MWe Biogas